- Client: TH Real Estate
- Architect: ARC-MC
- Value: £21M
Isle of Dogs, Canary Wharf
The construction of a shell and core 3 storey data centre facility on Millwall Inner Docks on the Isle of Dogs, Canary Wharf. The project was divided into two phases.
Phase 1 consisted of the demolition of two existing units and the construction of a new building containing a data centre.
Phase 2 involved the demolition of an existing unit, the construction of a new building and a link bridge at second floor level between the two phases.
The new steel framed buildings with braced composite floors comprise of a ground floor, two intermediate floors and a partial roof plant. Lift cores and stairs are of pre-cast concrete. The external elevational treatments are a mixture of granite cladding, glazed curtain walling and integral louvres.
- Client: TH Real Estate
- Architect: ARC-MC
- Value: £21M
"Metnor are very client focussed, enthusiastic and committed to delivering an excellent project" Adie Yates TH Real Estate